After removing the top canopy and removing the overhead console i prepared few tie-wrap holders to route the corrugated conduit.
I used rapid epoxy glue to install them on the top canopy.
I also used some heat shrink tube to reduce strain on the forward conduit.
In addition i fixed a couple of things on the overhead console with some carbon fiber and epoxy.